TCC
Tokyo Cycling Club
- Jun 30, 2013
- 2,360
- 1,298
Added the following;
1. 'Postponed' thread prefix to the Rides section. For typhoons, zombie apocalypses, etc. which mean rides need to be put on the backburner. Thought this would be good, as it means that we can sort through all the Postponed rides and then go and get them done, eventually. Once done, we can change the prefix back to the standard yellow 'Ride'.
2. Added a quick link to the Races section in the header menu, next to Rides.
1. 'Postponed' thread prefix to the Rides section. For typhoons, zombie apocalypses, etc. which mean rides need to be put on the backburner. Thought this would be good, as it means that we can sort through all the Postponed rides and then go and get them done, eventually. Once done, we can change the prefix back to the standard yellow 'Ride'.
2. Added a quick link to the Races section in the header menu, next to Rides.